BUS 286A (Ayers Street)

Monday - Friday, July 8 to 12, 7 a.m. to 5 p.m.

Traffic reduced to one lane in each direction for reconstruction of the existing southbound lanes of Business 286 (Ayers Street) from Holly to SH 357 (Saratoga Boulevard). Traffic control devices are in place. The speed limit in the work zone has been lowered from 45 mph to 35 mph for the remainder of the construction.